{"id":2404,"date":"2026-05-11T17:37:01","date_gmt":"2026-05-11T15:37:01","guid":{"rendered":"https:\/\/extendsclass.com\/blog\/?p=2404"},"modified":"2026-05-11T17:29:49","modified_gmt":"2026-05-11T15:29:49","slug":"how-it-teams-can-choose-erp-software-without-vendor-bias","status":"publish","type":"post","link":"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias","title":{"rendered":"How IT teams can choose ERP software without vendor bias"},"content":{"rendered":"\n<p>ERP projects almost never fall apart because a company missed one more product demo.<\/p>\n\n\n\n<p>They usually go wrong earlier. Leadership wants visibility. Finance wants cleaner approvals. Operations is tired of manual workarounds. IT wants systems that do not break every time data moves between platforms. Fair enough.<\/p>\n\n\n\n<p>Then the vendor meetings begin.<\/p>\n\n\n\n<p>The dashboards look sharp. The workflows seem simple. The presenters know which pain points to mention. After a few demos, though, everything starts to sound oddly familiar. Every platform is \u201cflexible.\u201d Every timeline sounds manageable. Every vendor has a story that feels close enough to your situation.<\/p>\n\n\n\n<p>That is the point where teams need to slow down.<\/p>\n\n\n\n<p>A polished ERP demo is not the same thing as a working ERP environment. It will not show messy customer records, half-documented approval rules, awkward legacy integrations, or employees who still trust spreadsheets because, to them, the spreadsheet has never let them down.<\/p>\n\n\n\n<p>For IT teams, <strong>ERP selection<\/strong> is not just a software comparison. It is an architecture, data, and business process decision all wrapped into one. The better question is not, \u201cWhich ERP looks best?\u201d It is, \u201cWhich ERP can this business actually use well after the sales team leaves the room?\u201d<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_47_1 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"ez-toc-toggle-icon-1\"><label for=\"item-6a05d32a9d91c\" aria-label=\"Table of Content\"><span style=\"display: flex;align-items: center;width: 35px;height: 30px;justify-content: center;direction:ltr;\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/label><input  type=\"checkbox\" id=\"item-6a05d32a9d91c\"><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Why_ERP_selection_gets_messy_fast\" title=\"Why ERP selection gets messy fast\">Why ERP selection gets messy fast<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Start_with_requirements_not_screenshots\" title=\"Start with requirements, not screenshots\">Start with requirements, not screenshots<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Software_fit_is_only_half_the_story\" title=\"Software fit is only half the story\">Software fit is only half the story<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Data_migration_deserves_more_respect\" title=\"Data migration deserves more respect\">Data migration deserves more respect<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Integration_claims_need_a_second_look\" title=\"Integration claims need a second look\">Integration claims need a second look<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#The_case_for_vendor-neutral_guidance\" title=\"The case for vendor-neutral guidance\">The case for vendor-neutral guidance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Build_the_business_case_before_the_purchase\" title=\"Build the business case before the purchase\">Build the business case before the purchase<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Change_management_cannot_be_an_afterthought\" title=\"Change management cannot be an afterthought\">Change management cannot be an afterthought<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Keep_scope_creep_visible\" title=\"Keep scope creep visible\">Keep scope creep visible<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Choose_for_where_the_business_is_going\" title=\"Choose for where the business is going\">Choose for where the business is going<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#ERP_is_really_a_business_transformation_project\" title=\"ERP is really a business transformation project\">ERP is really a business transformation project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/extendsclass.com\/blog\/how-it-teams-can-choose-erp-software-without-vendor-bias\/#Choosing_ERP_with_clarity_control_and_long-term_value\" title=\"Choosing ERP with clarity, control, and long-term value\">Choosing ERP with clarity, control, and long-term value<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_ERP_selection_gets_messy_fast\"><\/span><strong>Why ERP selection gets messy fast<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>ERP software<\/strong> sits close to the center of the company. It can touch accounting, procurement, inventory, sales, service, manufacturing, HR, reporting, and executive decision-making. That is why the buying committee rarely has one shared definition of \u201cbest.\u201d<\/p>\n\n\n\n<p>A CFO may care most about controls and reporting. Operations may want speed. Sales may want fewer handoffs. IT may be quietly thinking about APIs, security, uptime, and the support burden after go-live.<\/p>\n\n\n\n<p>None of those priorities are wrong. They just pull the conversation in different directions.<\/p>\n\n\n\n<p>A vendor might show a clean approval flow, but your actual process may involve multiple entities, regional exceptions, and data from another platform. A dashboard may look impressive but still depend on data your business does not capture consistently. That may not sound dramatic during selection. It becomes dramatic later, when executives ask why the new reports do not match reality.<\/p>\n\n\n\n<p>Demos can be useful. They give people a feel for the product. But they should not become the main decision-making tool.<\/p>\n\n\n\n<p>The less glamorous work, and usually the more useful work, is figuring out what the business needs before the buying process gains too much momentum.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Start_with_requirements_not_screenshots\"><\/span><strong>Start with requirements, not screenshots<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>One of the easiest traps is beginning with the software.<\/p>\n\n\n\n<p>It feels productive. Everyone joins a demo. The vendor walks through dashboards, automation, mobile access, reporting, the whole thing. Someone says, \u201cThis already looks better than what we have.\u201d<\/p>\n\n\n\n<p>Maybe it is better. In many cases, it probably is. But \u201cbetter than the old system\u201d is not the same as \u201cright for this company.\u201d<\/p>\n\n\n\n<p>A healthier process starts with <strong>internal discovery<\/strong>. This is also where <a href=\"https:\/\/kpcteam.com\/erp-advisory-services\"><strong>independent ERP advisory services<\/strong><\/a> can be useful, because they push teams to define needs before vendor messaging starts shaping the conversation.<\/p>\n\n\n\n<p>Before comparing systems, the organization needs to understand where work slows down, which manual tasks waste time, which reports people do not trust, which integrations are required at launch, which workflows vary by team, and which approval rules cannot be compromised.<\/p>\n\n\n\n<p>That work becomes the filter for every vendor conversation. It also gives the team something to return to when opinions start getting loud, which they usually do.<\/p>\n\n\n\n<p>Instead of asking, \u201cDo we like this system?\u201d the team can ask, \u201cCan this system support our real workflows, data model, controls, and growth plans without adding unnecessary complexity?\u201d<\/p>\n\n\n\n<p>Not flashy. Very useful.<\/p>\n\n\n\n<p><strong>ERP selection<\/strong> should not be a beauty contest between software demos. It should be a <strong>fit analysis<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Software_fit_is_only_half_the_story\"><\/span><strong>Software fit is only half the story<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>A good ERP system can still become a frustrating project if the <strong>implementation partner<\/strong> is the wrong match.<\/p>\n\n\n\n<p>This usually happens quietly, which is why it catches teams off guard. A company chooses a respected platform, signs the contract, and only then learns that the implementation team does not really understand its business model. Or the partner underestimates the data migration. Or the senior experts from the sales process are suddenly replaced by people the buyer has never met.<\/p>\n\n\n\n<p>By then, walking things back is painful and expensive.<\/p>\n\n\n\n<p>That is why partner evaluation deserves as much attention as software evaluation. The partner\u2019s methodology, team quality, communication style, and risk management can shape the experience as much as the platform itself.<\/p>\n\n\n\n<p>During selection, ask the questions that make people slightly uncomfortable. Who will be assigned day to day? Have they worked with companies like yours? What happens if a milestone slips? How much knowledge transfer is included? What support is available after go-live?<\/p>\n\n\n\n<p>Nobody gets excited about these questions. Still, they are often what keep a project from becoming miserable later.<\/p>\n\n\n\n<p>Independent ERP advisory services often give equal weight to <strong>partner fit<\/strong> and <strong>software fit<\/strong>, because the final result depends on both. A strong platform with weak implementation support can still leave users confused, reports unreliable, and leadership frustrated.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Data_migration_deserves_more_respect\"><\/span><strong>Data migration deserves more respect<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Data migration<\/strong> sounds like a back-office task until the team is deep into it.<\/p>\n\n\n\n<p>Then the old problems start appearing. Duplicate customer records. Vendor names entered five ways. Old product codes. Required fields that were optional in the old system. Reports built on data no one has consistently maintained.<\/p>\n\n\n\n<p>Moving data is not the same as preparing it. That distinction matters.<\/p>\n\n\n\n<p>If bad data moves into the new ERP, users notice quickly. A salesperson finds two versions of the same customer. A warehouse team sees inventory numbers that do not match reality. Finance questions a report. Someone exports a spreadsheet \u201cjust to check.\u201d Then another person does the same.<\/p>\n\n\n\n<p>Once that behavior starts, trust is hard to rebuild.<\/p>\n\n\n\n<p>A cleaner migration plan answers basic but important questions. What data is worth moving? What should be cleaned first? What should be archived? Who owns each data set? What must be validated before go-live?<\/p>\n\n\n\n<p>IT teams do not need perfect data. Perfect data is rare. They need data that is reliable enough for people to trust the system on day one.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Integration_claims_need_a_second_look\"><\/span><strong>Integration claims need a second look<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Modern ERP systems<\/strong> rarely stand alone.<\/p>\n\n\n\n<p>They often connect with CRM, eCommerce, payroll, warehouse, customer portal, analytics, procurement, or industry-specific tools. For IT teams, those connections can become one of the biggest sources of long-term maintenance.<\/p>\n\n\n\n<p>That is why <strong>integration planning<\/strong> belongs in the selection process, not after the contract is signed.<\/p>\n\n\n\n<p>When a vendor says, \u201cYes, we integrate with that,\u201d slow down for a moment. That sentence can mean a lot of things. It might mean there is a native connector. It might mean a third-party tool is required. It might mean the API exists, but the client team must fund custom development. It might also mean the integration works technically but is not common in a setup like yours.<\/p>\n\n\n\n<p>Before making a decision, get specific. Is the integration native, third-party, or custom? What data moves between systems? Does the sync happen in real time or on a schedule? Who monitors failures? Who supports the connection after go-live?<\/p>\n\n\n\n<p>These details affect cost, reliability, and user experience. They are not small print. They become part of the product experience users live with every day.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"The_case_for_vendor-neutral_guidance\"><\/span><strong>The case for vendor-neutral guidance<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>ERP vendors<\/strong> know their products. Implementation partners know the systems they prefer to implement. Their input can be valuable, but it comes from a specific point of view.<\/p>\n\n\n\n<p>The buyer needs a point of view too. Preferably one that is not being shaped entirely by the strongest sales presentation.<\/p>\n\n\n\n<p><strong>Independent ERP advisors<\/strong> bring a different role to the process. They are not there to sell one platform over another. Their job is to help the organization compare options, challenge assumptions, identify risks, and stay focused.<\/p>\n\n\n\n<p>For companies that want an unbiased approach, independent ERP advisory services can help create a structured process for comparing systems, evaluating partners, managing risk, and aligning the final decision with business goals.<\/p>\n\n\n\n<p>That support can be especially helpful when stakeholders disagree. And at some point, they usually do. A neutral process gives the team something more useful than opinions. It creates a shared way to judge trade-offs, question vendor claims, and decide what matters most.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Build_the_business_case_before_the_purchase\"><\/span><strong>Build the business case before the purchase<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>ERP projects are expensive, and licensing is only one part of the bill.<\/p>\n\n\n\n<p>A practical <strong>business case<\/strong> looks at implementation services, internal time, data migration, integrations, training, testing, support, and the slowdown that often happens when people learn a new system. When independent ERP advisory services are involved, the business case is often built around total cost, operational impact, implementation effort, and long-term value rather than vendor pricing alone.<\/p>\n\n\n\n<p>The same business case should explain what the company expects to improve: faster month-end close, better inventory accuracy, fewer manual approvals, more reliable reporting, less spreadsheet dependency, stronger audit controls, or easier expansion.<\/p>\n\n\n\n<p>This document becomes useful later, because ERP projects do get noisy. If a team asks for another customization, report, or workflow exception, leaders can return to the business case and ask whether the request supports the reason the ERP project exists.<\/p>\n\n\n\n<p>Without that discipline, scope grows quietly. Then suddenly it is not so quiet anymore.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Change_management_cannot_be_an_afterthought\"><\/span><strong>Change management cannot be an afterthought<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Many <strong>ERP failures<\/strong> are not really software failures. They are adoption failures, which can be harder to fix.<\/p>\n\n\n\n<p>People may say they want a new system, then return to old spreadsheets as soon as the new process feels unfamiliar. Managers may ask for better reporting but resist standardizing the data behind those reports. Departments may agree to new workflows in meetings and then keep doing things the old way under pressure.<\/p>\n\n\n\n<p>None of this is unusual. It is human. Pretending otherwise usually makes the rollout harder.<\/p>\n\n\n\n<p>That is why <strong>change management<\/strong> belongs inside <strong>ERP planning<\/strong> from the start. Training alone is not enough. People need to understand what is changing, why it matters, and how the new process affects their daily work.<\/p>\n\n\n\n<p>A useful change plan includes clear communication, early involvement from key users, practical process documentation, role-based training, visible executive support, feedback channels, and extra help during the first few weeks of real use.<\/p>\n\n\n\n<p>Go-live is not the finish line. It is the moment the project meets reality, and reality is usually less tidy than the project plan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Keep_scope_creep_visible\"><\/span><strong>Keep scope creep visible<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>ERP projects<\/strong> attract <strong>scope creep<\/strong> because every department sees an opportunity to fix old problems.<\/p>\n\n\n\n<p>Some requests are worth adding. Others are old habits dressed up as requirements. The difficult part is telling the difference early enough to keep the project from becoming too heavy.<\/p>\n\n\n\n<p>Scope usually grows one small decision at a time. A custom field here. A special report there. One more workflow exception. One more integration. None of these may seem risky alone, but together they can stretch timelines, increase costs, and make the system harder to support.<\/p>\n\n\n\n<p>A simple governance rule helps: every change request should be judged against business value, technical impact, timeline impact, cost, risk, user adoption, and alignment with the original goals.<\/p>\n\n\n\n<p>Customization is not the enemy. Sometimes it is exactly what the business needs. But recreating every old process inside a new ERP system is usually a missed opportunity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Choose_for_where_the_business_is_going\"><\/span><strong>Choose for where the business is going<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Scalability<\/strong> is not about buying the biggest system. It is about choosing a system that can support the next stage of the business without overwhelming the current one.<\/p>\n\n\n\n<p>A system that is too small may limit growth. A system that is too complex may slow the company down before it delivers value.<\/p>\n\n\n\n<p>IT teams should look ahead with realistic questions. Will the system support more users? Can it handle more locations or business units? What happens if transaction volume doubles? Can reporting mature over time? Will new integrations be manageable?<\/p>\n\n\n\n<p>The goal is not to buy for every possible future. That gets expensive fast. The goal is to avoid choosing a system the company will outgrow too soon.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"ERP_is_really_a_business_transformation_project\"><\/span><strong>ERP is really a business transformation project<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>ERP selection<\/strong> is often described as a software project. That description is too neat.<\/p>\n\n\n\n<p>A new ERP system changes how work gets done. It affects approvals, reporting, data ownership, collaboration, and accountability. It can also expose weak processes that were hidden inside spreadsheets or older systems for years.<\/p>\n\n\n\n<p>That is why ERP projects need both IT and business leadership.<\/p>\n\n\n\n<p>IT brings structure, security, integration knowledge, data discipline, and system governance. Business teams bring process knowledge, operational reality, and user context. If either side works alone, the project suffers.<\/p>\n\n\n\n<p>When both sides work together, ERP becomes more than a replacement system. At least, it has a chance to. It becomes a chance to simplify workflows, clean up data, improve visibility, and build a more reliable operating model.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Choosing_ERP_with_clarity_control_and_long-term_value\"><\/span><strong>Choosing ERP with clarity, control, and long-term value<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Choosing ERP software without <strong>vendor bias<\/strong> takes patience, which is not always easy when timelines are tight.<\/p>\n\n\n\n<p>It means slowing down before demos. It means understanding requirements, checking implementation fit, planning data migration, questioning integration claims, building a realistic business case, and preparing users for change.<\/p>\n\n\n\n<p>Independent ERP advisory services can support that kind of discipline by keeping the process objective, practical, and focused on business outcomes instead of vendor momentum.<\/p>\n\n\n\n<p>The right ERP system should reduce friction, improve visibility, support growth, and give teams confidence in their data. But that result does not come from a polished presentation or a rushed buying cycle.<\/p>\n\n\n\n<p>It comes from choosing carefully, asking better questions, and treating ERP as a long-term business decision, not a short-term software purchase.<\/p>\n","protected":false},"excerpt":{"rendered":"<p> Learn how IT teams can compare ERP vendors, plan integrations, reduce implementation risk, and choose software with more confidence.<\/p>\n","protected":false},"author":8,"featured_media":2405,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_sitemap_exclude":false,"_sitemap_priority":"","_sitemap_frequency":""},"categories":[5],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/posts\/2404"}],"collection":[{"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/comments?post=2404"}],"version-history":[{"count":1,"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/posts\/2404\/revisions"}],"predecessor-version":[{"id":2406,"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/posts\/2404\/revisions\/2406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/media\/2405"}],"wp:attachment":[{"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/media?parent=2404"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/categories?post=2404"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/extendsclass.com\/blog\/wp-json\/wp\/v2\/tags?post=2404"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}